What is
design-build?

What is design-build?

One firm handles design and construction under a single contract. We have worked this way since 2015. Some clients use our in-house design team; many come with an architect they have already chosen.

The team that designs is the same team that builds. Design is buildable from day one. Budget stays aligned. One team owns accountability. The builder is at the design table early, validating cost before bid-shock derails the project.

One Team. One Contract. Zero Gaps.

Herringbone backsplash detail by Reschka Design Build
Two-story living room with custom fireplace by Reschka Design Build

Design-Build + Traditional

Design-build vs. traditional.

The traditional construction model (hire an architect, complete the design, then bid the plans to general contractors) has three structural problems that design-build eliminates.

Design-Build Combined collaboration from day one
1Preparation
2Planning
3First Design
4 Finalized Design Cost locked
5Construction
Time Saved
Traditional Design-bid-build · sequential phases
1Preparation
2Choose Architect
3First Design
4Bid to Builders
5 Finalize Details Cost locked
6Construction
Start Move-in
Cost locked earlier. Design-build establishes total cost before construction starts — traditional locks it only after bidding is complete.
15–25% faster. Overlapping design + construction planning eliminates the redesign cycles that happen when bids come in over budget.

The Budget Gap

The architect designs without real-time cost feedback. Plans go to bid and come back 20–40% over. Design-build validates every decision against current rates while the plan is still yours to change.

The Accountability Gap

When something goes wrong, the architect blames construction and the contractor blames design. You mediate. Design-build runs on one contract. No ambiguity about who owns the outcome.

The Timeline Gap

Traditional delivery is sequential: design, bid, build. Design-build overlaps phases — preconstruction, trade coordination, and long-lead procurement run in parallel with design. That overlap saves 15–25% on total timeline.

Bright kitchen design detail by Reschka Design Build
Custom home front elevation by Reschka Design Build in Oakland County

How It + Works

The design-build process.

Five phases. One team owns all of them, so the handoff gaps that plague traditional construction never appear.

01

Discovery & Feasibility

1–2 weeks · no cost

We listen to your goals, walk the property, and assess feasibility against budget and timeline. You leave knowing whether design-build fits.

02

Preconstruction Agreement

4–8 weeks · paid

Design, engineering, selections, permits, and cost validation against a live model. You end with completed plans, a fixed construction price, and a construction contract. Construction is optional.

03

Design Development

concurrent with preconstruction

Construction validates buildability and flags cost impacts as drawings develop. That overlap eliminates the redesign cycles that happen when bids come in over budget.

04

Construction

varies by scope

The team that designed the project manages construction. Scope, selections, and costs are defined before the first swing. Whole-home remodels run 6–14 months. Custom homes run 12–18 months.

05

Completion & Closeout

1–2 weeks

Final walkthrough, punch list, formal handover. You receive warranty documentation, maintenance guidance, and the complete project record — every decision, spec, and email on file years later.

Modern bathroom vanity detail by Reschka Design Build
Woodland Estate custom home by Reschka Design Build

What It + Costs

What design-build costs.

Design-build doesn't change the cost of materials and labor. It changes budget predictability.

Change orders are the main source of budget surprises. In design-build they average 3–7% of contract value vs. 10–20% traditional. The difference is earlier cost validation.

The benefit applies whether the design comes from our in-house team or an architect you already trust. What matters is that the builder is in the design conversation before bids.

Custom homes From $700K ($250–$400+/sf)
Whole-home remodels From $200K
Integrated additions From $200K
Commercial tenant improvements Quoted by scope
Hazelhurst remodel interior detail by Reschka Design Build
Elmwood Estate integrated addition by Reschka Design Build

How to + Evaluate

How to evaluate a design-build firm.

Not every firm calling itself "design-build" actually operates that way. Five criteria separate the real from the rebranded.

01

In-house design capability

The firm employs designers and architects directly, or partners with architects who stay on the team through construction. Not handed off after drawings.

02

A paid preconstruction phase

Firms offering "free estimates" for complex work are cutting corners or burying the cost elsewhere. A paid preconstruction phase is how design-build firms deliver accurate pricing and buildable plans.

03

Published pricing

Fewer than 10% of design-build firms publish investment ranges. Firms that do trust their pricing process.

04

Frequent progress reporting

Weekly check-ins and crisis calls aren't reporting. A committed design-build firm delivers routine updates with photos, milestones, and next steps.

05

Portfolio of similar scope

Ask to see completed projects at your scope and investment level. A firm that builds $50K bathrooms isn't automatically qualified for a $700K custom home.

How Reschka Design Build measures up.

We meet all five. Some clients work with our in-house design team from first sketch. Others arrive with an architect in place and want a builder who'll collaborate. Both paths run the same workflow: preconstruction, cost validation, fixed-price construction contract, one point of accountability.

Every project runs through paid preconstruction. We publish investment ranges. Clients receive weekly progress reports. Our portfolio shows completed work at the scope we build — no $50K bathrooms mixed with $2M custom homes.

Custom bathroom millwork by Reschka Design Build
Active construction site managed by Reschka Design Build

Common + Questions

Frequently asked.

Do I need an architect if I hire a design-build firm?

Not always. We offer in-house design and also collaborate with architects our clients bring in. Either path puts the builder in the design conversation from day one and gives you one point of accountability through construction.

Can I use my own architect with a design-build firm?

Yes, and many projects start that way. When you bring an architect you already trust, we join the first working session to validate buildability and cost as design develops. The architect leads design; we bring constructibility and budget intelligence. The contract stays single-source through RDB.

What is a preconstruction agreement?

A paid contract covering design, engineering, and planning. Typically 3–8% of estimated construction value. You end with completed plans, a fixed construction price, and a construction contract. Not obligated to proceed.

How long does a design-build project take?

Whole-home remodels run 6–14 months. Custom homes 14–24 months. Additions vary by scope. Every project includes preconstruction (4–8 weeks) before construction. Design-build timelines typically run 15–25% shorter than traditional.

Is design-build right for every project?

Design-build works best for complex projects: multiple rooms, structural changes, additions, or custom homes. For a straightforward bathroom update or cosmetic refresh under $50,000, a contractor directly is usually simpler.

Last updated: April 2026