Choose a design-build firm on how it gets to a price, not on the first price it quotes. A firm worth hiring can show you a Michigan builder license, a paid preconstruction phase that ends in a fixed construction price, completed projects at your scope, and a written process for changes. The seven checks below take about two conversations to run.
This guide is written by Reschka Design Build, a design-build firm in Oakland County. We'd rather you run these checks on us than take our word for it.
What a Design-Build Firm Is
A design-build firm takes responsibility for both the design and the construction of your project under one contract. It is also your general contractor. The difference is timing: the builder is in the room while the drawings are being made, so cost and constructability shape the design instead of reacting to it.
The label itself isn't regulated. Any contractor can put "design-build" on a truck. That's why the questions below matter more than the name. They separate firms that run a real design and preconstruction process from firms that sketch a layout and start demolition.
Seven Things to Check Before You Sign
1. License and Insurance
Michigan licenses residential builders through the Department of Licensing and Regulatory Affairs (LARA), and you can look up any license number online. Ask for the number and a certificate of insurance before the second meeting. Reschka Design Build holds Michigan Residential Builder license 2102211408.
2. Who Does the Design
Ask who draws the project and whether that person stays on the team through construction. Some firms design in-house. Some work with the architect you bring. Both can work. What doesn't work is a designer who hands off drawings and disappears before the first wall opens.
3. A Paid Preconstruction Phase
Accurate pricing takes real work: field-verified existing conditions, drawings, engineering, selections, and pricing from the trades who will do the job. A firm that does this work charges for it. Our Preconstruction Agreement typically runs 3–8% of estimated construction value and takes 4–8 weeks. You aren't obligated to build with us at the end of it.
4. How the Price Becomes Fixed
Ask when you get a fixed construction price and what it's based on. The answer you want: after scope, drawings, selections, and site conditions are understood, and before construction starts. Then ask which line items are still allowances at signing. A long list of allowances is a price that hasn't been set yet.
5. How Changes Are Handled
Changes happen on every project. The question is what the paperwork looks like. Each change should be documented, priced, and approved in writing before the work proceeds. If the answer is "we'll sort it out at the end," expect a difficult final invoice.
6. Completed Work at Your Scope
Ask to see finished projects that match yours in type and budget. A firm that builds $50K bathrooms isn't automatically qualified for a $700K custom home, and the reverse is true too. Ask what went wrong on one of them and how it was resolved.
7. How You'll Be Kept Informed
Find out who your single point of contact is, how often you'll hear from them, and in what form. Daily project logs and a weekly update are a reasonable standard. Also ask how many projects the firm runs at once. We take 12 projects a year so each one gets attention.
Good Answers and Warning Signs
| Question | A good answer | A warning sign |
|---|---|---|
| Can I see your license? | A number you can verify with the state | "We work under someone else's license" |
| What does the first number cost me? | A planning range is free; a fixed price comes from paid preconstruction | A detailed "free estimate" on a complex project |
| When is the price fixed? | Before construction, after drawings and selections | "It depends what we find" |
| Who designs it? | A named designer or architect who stays through construction | "We'll draw something up" |
| How do changes work? | Written change order, priced and approved first | Verbal approvals, settled at the end |
| Have you built this before? | Completed projects at your scope and budget | Photos only, no project details |
Questions to Ask on the First Call
- What is your license number, and who carries your insurance?
- Do you design in-house, with my architect, or both?
- What does your preconstruction phase include, what does it cost, and what do I own at the end?
- At what point do I get a fixed construction price?
- What is still an allowance when I sign the construction agreement?
- How are change orders documented and approved?
- Which completed projects are closest to mine, and can I see them?
- Who will I talk to each week, and how many projects are you running right now?
A firm that answers these plainly is a firm you can plan around. A firm that gets vague on the third question is telling you something too.
What's Different in Oakland County
Local conditions change what a firm needs to know. Each municipality runs its own building department and permit process. Many Bloomfield Hills and Troy subdivisions add association or architectural review on top of the city permit. Second-story additions on 1950s–1970s homes in Birmingham and the Bloomfields need foundation capacity analysis before anyone draws a floor plan. Lake lots in West Bloomfield carry shoreline permits and setback rules.
Ask any firm what it has built in your town and how it handled the permit. Reschka Design Build works in seven Oakland County communities: Birmingham, Bloomfield Hills, Bloomfield Township, West Bloomfield, Rochester, Rochester Hills, and Troy. Each has its own page under areas we serve.
How Reschka Design Build Answers
We're an owner-led design-build firm, founded in 2015 by Alex Reschka. We design and build custom homes from $700K, and whole-home remodels and additions from $200K. Design happens in-house or alongside your architect. Either way the contract is single-source.
Every project runs through four phases: Discovery, Preconstruction, Construction, and Handoff. Preconstruction is paid and ends with completed plans and a fixed construction price. Changes after that are written, priced, and approved before work proceeds. Our price ranges are published.
If you're comparing firms, start a conversation. We'll tell you early whether the project fits.
Frequently Asked Questions
What should I ask a design-build firm before hiring?
Ask for the license number and proof of insurance, who does the design, what the preconstruction phase includes and costs, when the price becomes fixed, how change orders are approved, and which completed projects match yours in scope and budget. Plain answers to those six questions tell you most of what you need to know.
Is a paid preconstruction agreement normal for design-build?
Yes. Accurate pricing requires field verification, drawings, engineering, selections, and trade pricing, and that is real work. At Reschka Design Build the Preconstruction Agreement typically runs 3–8% of estimated construction value and takes 4–8 weeks. It ends with completed plans and a fixed construction price, and you are not obligated to proceed.
Do design-build firms give free estimates?
A reputable firm will usually share a planning-level range after an initial conversation and a site walk. A detailed, fixed price for a complex project requires defined scope, selections, and trade input, which is what paid preconstruction produces. Be cautious of a detailed free estimate on a whole-home remodel, addition, or custom home.
Can I use my own architect with a design-build firm?
With many firms, yes. Reschka Design Build works both ways: in-house design, or alongside the architect you have already chosen. The architect leads the design, the builder brings constructability and pricing from the first working session, and one contract covers construction.
What is the difference between a design-build firm and a general contractor?
A general contractor builds from drawings someone else produced, usually after competitive bidding. A design-build firm is also the general contractor, but it joins before the drawings are finished, so pricing and constructability shape the design instead of reacting to it.